Team Power Group Power Line Constrcution
JL Malone specializes in building Electrical Substations up to 230kV.  Our Teammates are highly trained to work safely around energized facilities whether in new construction environments or when making modifications to existing substations.  
  • Substation installations and modifications through 230,000 Volts
  • Concrete cable trench installations either precast or cast in place
  • Control and Relay Panel Wiring
  • Coordination Studies, Relay settings, Testing and Startup
  • Transformers and Breaker  furnished and installed
  • Unit Substations, Isolated Phase Bus power Duct through 35,000 Volts
  • Switchgear Installations through 35,000Volts
  • Repairing Equipment in Energized substations
  • Overhead welded substation bus
  • Oil Containment Systems   

JL Malone & Assoc. LLC
Corporate Office
PO Box 3367
Albany, GA 31706
ph. 229-439-2351 | fax 229-439-8224